Tie-down Vector Dynamics Foundation System for Wind Zones I Manuel d'utilisateur Page 9

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 19
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 8
A
B
D
C
Long U-Bolts
Page 9 4/3/2013
Set-Up Instructions for
Vector System #59018
1. Set Vector Pads
Clear all vegetation where pads will rest. Place a long
U-boltinpadasshown.Pressorhammerpadintothe
ground.
2. Set Block or piers on pads.
Center foundation blocks or piers on pads. Place
pre-cut center compression member between blocks,
restingonpads,centersbetweenU-boltsasshown.
3. Outside Tension Bracket
Attachoutsidetensionbracketasshowntooutside
of pads.
4. Inside brackets & straps
AttachtheinsidetiebracketstotheU-boltsoverthe
compressionmember.Attachastrapw/hookorswivel
strap w/nut & bolt. Place other end of the strap over
opposite I-beam & down to outside tension bracket.
Cutstrap12-15inchespastbracket.Attachstrap
& slotted bolt in bracket. Tighten strap until tight with
4-5wrapsaroundbolt.Repeatwithoppositestrap.
Vue de la page 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 18 19

Commentaires sur ces manuels

Pas de commentaire