Tie-down Vector Dynamics Foundation System for Wind Zones l Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
Vector Dynamics System
for Concrete Applications
Instructions (3 of 3)
Single Longitudinal System
#59036
Double Longitudinal System
#59046
18. InstalllongitudinalframebracketstoI-beam(donottighten).
19. Attach longitudinal strut to frame bracket and vector pad.
20. Pull frame bracket clamps with fastened strut outward to remove any slack.
21. Tighten all nuts and bolts on struts and beam clamps.
3/4"
17/32"
from end
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
3/4"
17/32"
from end
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
3/4"
17/32"
from en
d
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
3/4"
17/32"
from end
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
12 Revised: 8/19/08
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 23 24

Commentaires sur ces manuels

Pas de commentaire